Construction project planning and monitoring for building contractors — connecting project planning with what happens on site.

Overview

What is DBOT Track?

For site teams

Plan the work.
Report the site.

PlanWork, resources and people, day by day
ReportWhat got done and what was used, daily
For leadership & PMs

Everything brought together, to understand:

What's committed
How it's progressing
Time and resource consumption
How it fits together

Four connected parts

01

Baseline

Project information, connected through Takeoff

See Baseline →
02

Planning

Agreed targets and detailed Work Packages

See Planning →
03

Tracking

Work completed and resources used

See Tracking →
04

Insights

Project timeline and resource consumed

See Insights →
01 · Baseline

Bring in the project information

Start with what the contractor already has. DBOT Track takes in the BOQ, the schedule and the rate analysis, with GFC drawings as they become available.

BOQBill of Quantities
ScheduleWork items and timeline
Rate AnalysisResources budgeted
GFC DrawingsAs they become available
Project baselineThe starting point for everything that follows
Baseline · Quantity Surveyor

Takeoff inside DBOT Track

The QS validates the GFC drawing and measures the work in the system — so every quantity stays linked to its drawing, BOQ item, schedule and rate analysis.

  1. 1
    Measure on the GFCDraw the shape over the room
  2. 2
    Add a parameterWastage, with its quantity and unit
  3. 3
    Write the formulaCombine shapes and parameters
  4. 4
    EvaluateThe quantity is calculated
Takeoff · 2BHK Floor Tiling
Takeoff: the Living / Dining room is traced on the GFC (24 m²), a Wastage parameter of 1.05 is added, the formula AR × Wastage is entered, and Evaluate gives 25.2 SqM
02 · Planning · Level 1

Lookahead Planning

Leadership and the project manager agree what the team will deliver over the coming period — checked line by line for readiness before it is committed.

  1. 1
    Set the targetLeadership picks a date; the forecast gives the value
  2. 2
    Review readinessThe PM ticks each item or sets an ETA
  3. 3
    Approved LookaheadTrack delivery against the commitment
Insights · Lookahead
Lookahead: setting the target date and preview, the PM review checklist, then the Approved Lookahead summary
Planning · Level 2 · Site Engineer

Work Package Planning

The site engineer turns the approved commitment into executable work: a zone on the drawing, the quantities and value it carries, and a day-by-day plan.

  1. 1
    SelectA line item from the Approved Lookahead
  2. 2
    Mark the zoneQuantity and value come from the takeoff
  3. 3
    Plan the daysSub-activities, resources, SE and QC
Plan Work Package
Work Package: Blockwork is selected, a zone is drawn over the living wing of the GFC giving 30 CUM and ₹3,00,000, then the day-wise plan is filled in
03 · Tracking · Site Engineer

Daily Progress Report

Progress is marked directly on the drawing, and the day's plan is confirmed against what actually happened — quantities and value are calculated, not re-entered.

  1. 1
    Log progressTap a wall, choose how much is done
  2. 2
    Confirm the day's planDone, partly done or not done, with resources used
Daily Progress Report · Apartment 102
DPR: a partition wall is marked 50% done, adding 0.884 CUM and ₹8,838; then the day's sub-activities are confirmed
Tracking · Automatic

Compiled into four views

Every submitted report is regrouped automatically — no collecting and re-keying daily sheets.

Material consumption
Machinery utilisation
Labour usage
Progress against BOQ
04 · Insights · Time

What progress means for the timeline

Review how work has progressed, see the forecast finish, and plan the next commitments — on one curve.

ScheduledPlannedActualForecast
Today Forecast finish LookbackHow work has progressed LookaheadNext commitments Schedule forecastExpected completion
Insights · Cost

Planned vs actual unit price

For every BOQ line item: what each unit was budgeted to cost in resources, and what it is actually costing. Open a row to see the resources behind it.

PlannedActual
BOQ line itemQtyResourcesUnit priceQty doneConsumedUnit priceChange
›Blockworkper CUM100₹4,20,000₹4,20035
₹1,57,500₹4,500▲ 7%
For 35 CUM donePlanned resourceConsumed so far
Mason · labour28 man-days31 man-days▲ 11%
Helper · labour42 man-days45 man-days▲ 7%
AAC blocks1,190 nos1,225 nos▲ 3%
Cement18 bags17 bags▼ 6%
Plasteringper SqM1,240₹2,23,200₹180610
₹1,03,700₹170▼ 6%
Tile Flooringper SqM2,400₹15,60,000₹650611
₹4,15,480₹680▲ 5%
▲ costlier · ▼ cheaper than planned · Unit price = resources ÷ quantityFigures are illustrative.
DBOT Track

Connecting project planning with what happens on site.

TakeoffLookaheadWork PackageDPRInsights
Contact

Talk to us

See how DBOT Track would work on your projects. Tell us a little about your company and we'll get back to you.

Office

3E, Emporio, 10th Avenue, Ashok Nagar, Chennai – 600083, India

Thanks — we'll be in touch shortly.
We'll only use this to reply to you.